3) Q: How long does it take for our log home to be built once the decision to build one is made?
A: The length of time required to build each home depends upon the size and complexity of the home. The Andersen teams pre-builds your home on our site, codes and tags each tree, then disassembles the log shell onto trailers, then reassembles your home on your land. Our recommended General Contractors and sub-contractors are then able to completely finish your home on your site. Generally, log shell construction time for home sizes of 1,000 to 1,200 square feet on the main floor will take about 6 to 8 weeks to pre-build on our building site, with two days to reassemble the log shell on your site. A larger home will take longer - up to three months on our site, and 2 - 4 days to reassemble on your site. The more intricate roof system designs and additional log walls and log trusses will lengthen the time it takes to reassemble on your site. Turn-key projects (Log home completely finished - turn the key and move in) for a home with approx. 1,200 square feet will take about 6 months to complete. A home with 2,000 square feet on the main floor, finished basement and loft with bedrooms and a bath can take from six to nine months for full completion. Quality cannot be rushed and you will be proud of the results.
|

|